Quantcast
Channel: Hong Kong Land Law Blog
Viewing all articles
Browse latest Browse all 481

Interpretation of clause modifying duty to respond to requisitions concerning unauthorised structures

$
0
0

In Channel Green Ltd v Huge Grand Ltd ([2013] HKEC 1124, CFI) CG had entered into a contract to buy property from HG. It had paid a 15% deposit. The contract contained a clause to the effect that the property was sold on an ‘as is’ basis. The clause provided that CG could neither raise requisitions concerning unauthorised additions, alterations or illegal structures nor refuse to complete or delay completion on account of any such matters. There were several unauthorised structures at the property. CG raised requisitions concerning these structures and refused to complete. HG elected to terminate the contract and forfeit the deposit as a result.

The question was whether, as a matter of contractual interpretation, the relevant clause meant that CG had no right to raise requisitions nor to refuse to complete on account of the unauthorised structures. The Court of First Instance decided that this was the case ([91] – [98] per Recorder Coleman SC).

The court noted that although the content of pre-contractual negotiations is irrelevant to the process of interpretation, statements of fact made in the course of negotiations are good evidence as to the context or factual matrix and so  are relevant to the construction of the contract ([23]). Thus, the fact that HG had informed CG of the existence of a number of the unauthorised structures before contracts had been exchanged was relevant to the construction of the clause.

The court also considered whether the 15% deposit was a true deposit or whether it could potentially be a penalty and decided that it was a true deposit. While the amount exceeded the conventional 10%, this was justifiable in the context of a lengthy period between contract and completion ([109).