Specific performance: ready willing and able; hardship; calculating damages

$
0
0

In Siu Wei v Ng Ying Ying ([2016] HKEC 1162, CFI) S and P entered into a provisional sale and purchase agreement for the sale and purchase of property. S later decided that she wanted to keep the property and refused to complete. S admitted that she was in breach of contract. P now sought specific performance.

  1. Was P ready, willing and able to perform his obligations under the contract?
  2. S argued that specific performance would inflict great hardship on her and so should be refused.
  3. P sought damages in addition to specific performance. How should these be calculated?

1 Ready, willing and able?

This must be the case both at the date of the writ and at the date of the decree. Anthony To J. commented that P needed to show:

‘on a balance of probability that he was and is ready, willing and able to perform his obligations at the material times as those obligations fall due in the sense that he is not presently incapacitated from future performance and is not indisposed to do what the contract requires when the time comes. It is all a matter of evidence, a matter of credibility for the court.’ ([33])

P satisfied this test.

2 Relevance of hardship

Specific performance will not be granted if to do so would inflict great hardship on the defendant (S here). Hardship involves a balancing of the position of both parties:

‘A defendant has to show hardship in the sense of relative prejudice. He has to show that he would suffer greater prejudice if an order of specific performance is made against him than that likely to be suffered by the injured party if the order is refused.’ ([38])

This test favoured P; he really wanted to live in the flat while it was merely a commodity for S. He would be put to additional transaction costs (including a higher level of stamp duty) if he had to buy another property([44] – [46]).

Conduct was also relevant and S had not conducted her defence in good faith ([44]).

3 Calculation of damages

‘In the case of delay in conveyance of property, the normal compensation is the value of the user of the property, which will generally be taken as its rental value, for the period from the contractual time for completion to the date of actual completion’ ([48])

P was entitled to the rental value of the property for this period but reduced by the amount of mortgage interest that he would have had to pay, had completion gone ahead, but had been ‘saved’ from by the refusal of S to complete on time ([52]).

Michael Lower